1. EachPod

The Oakland A's Seem to be Moving to Las Vegas, Sunset Cocktails at Cosmo, Tips to Avoid What Happened to Us at BrewDog, What's the Deal with The Polo Towers, Transfix Art Opens, BLACKPINK Show Announced, Construction Delays | Ep. 165

Author
Las Vegas Insiders | Sean McAllister and Dayna Roselli
Published
Sat 22 Apr 2023
Episode Link
None

Send us a text

Breaking news, Las Vegas could be getting a professional baseball team. The major development that "almost" locks it in. BLACKPINK is coming to Las Vegas on their North American Tour. Morris Day and The Time announce shows at The Strat. Dayna does Jury Duty and gets sat on a trial. We discuss our not so favorable experience at BrewDog on the strip and have some tips for you to avoid what happened to us. We dig into the history of the Polo Towers on the strip. We actually have never been inside, but apparently it was a popular place back in the day. Transfix Art opens at Resorts World with more than 50 immersive installations. Construction is in full force around the strip! Enjoy some cocktails, listen to live music and watch the sunset at the Cosmopolitan pool deck.

VegasNearMe App
If it's fun to do or see, it's on VegasNearMe. The only app you'll need to navigate Las Vegas.

Disclaimer: This post contains affiliate links. If you make a purchase, I may receive a commission at no extra cost to you.

Support the show

Follow us on Instagram: @vegas.revealed
Follow us on Twitter: @vegasrevealed
Follow us on TikTok: @vegas.revealed
Website: Vegas-Revealed.com

Share to: