1. EachPod

Details and Plans

Author
Greg Hutchins
Published
Mon 04 Dec 2023
Episode Link
https://accendoreliability.com/podcast/sor/sor-919-details-and-plans/

Details and Plans


Abstract


Greg and Fred discuss why and how the triple constraints of a project: schedule, cost, and scope variances result in risks that can result in project failure.



Key Points


Join Greg and Fred as they discuss schedule risk, cost risk, and scope risk.  Topics include:



  • What are schedule, cost, and scope risks?

  • How do you measure each?

  • How can each contribute to project failure?

  • How can you manage and mitigate these risks?


Enjoy an episode of Speaking of Reliability. Where you can join friends as they discuss reliability topics. Join us as we discuss topics ranging from design for reliability techniques to field data analysis approaches.








Show Notes


 


The post SOR 919 Details and Plans appeared first on Accendo Reliability.

Share to: