Our power infrastructure survived last week’s heatwave, which saw the PJM Interconnect system peak at an almost twenty year high of 160,560 Megawatts on June 23. Natural gas provided 44% of generation, with solar at 6%. The ISO-NE system that covers New England saw peak demand a day later. This was met 47% by natural […]