Join Paul Abernathy as he answers a question submitted on what happens when you install a manual transfer switch between the meter and the service disconnection means as well as a discussion on the changes and clarity to supply-side connections made in 705.11 for the 2020 NEC.
Become a supporter of this podcast: https://www.spreaker.com/podcast/ask-paul-national-electrical-code--4971115/support.